The Milestones I want to have done are:
Pencil tests drawn out and animated
Still images coloured
sound design underway
and cd and dvd cover done
Monday, August 27, 2012
Wednesday, August 22, 2012
Wednesday, August 15, 2012
Week 4
Getting through all the basic movements and point to point animation and layout of movement in FLASH>
Getting Adobe programs onto my Mac so I can hopefully work from home. I still need a little help with getting all the animation right but I think I am doing okay for now, would be a lot easier if I didn't have to worry about the assignments from the other subjects to get this completed on time but it is what it is. I can only do what I can, I'm not superman, nor am I Super Late....hopefully
Getting Adobe programs onto my Mac so I can hopefully work from home. I still need a little help with getting all the animation right but I think I am doing okay for now, would be a lot easier if I didn't have to worry about the assignments from the other subjects to get this completed on time but it is what it is. I can only do what I can, I'm not superman, nor am I Super Late....hopefully
Monday, August 13, 2012
Okay, first things first, I have been brutally sick, had a horrific virus that had me bedridden for 2 weeks, no way I could post anything on here or do any work at tafe, I am currently working my ass off and doing all I can to catch up.
So far, I am drawing out basic figures for each moving animated shot in FLASH. I have 16 flash videos drawn out and will drop them into my animatic sequence when I am able to.
To all teachers: I have a medical certificate and request a 2 week extention on all my work, please
So far, I am drawing out basic figures for each moving animated shot in FLASH. I have 16 flash videos drawn out and will drop them into my animatic sequence when I am able to.
To all teachers: I have a medical certificate and request a 2 week extention on all my work, please
Subscribe to:
Posts (Atom)